ROCK CREEK/AMBERWOOD DRIVE BRIDGE REPAIRS:

About:

This project will repair an erosion problem affecting a bridge support on the Amberwood Drive Bridge over Rock Creek. Riprap (large rocks) will be placed at the edge of the support to prevent any further erosion. A wetland consultant will acquire the needed permits from the Department of State Lands (DSL) and/or Army Corp of Engineers. Repairs will be made during the in-water work period (usually July 1-September 30).

Project Contact:

Amica Bose
Project Engineer
503-681-5218
Send an email.

Activity:

Current Activity – Preliminary Planning .

Map:

Project Timeline:

  • Anticipated Completion Date: October 2011
  • Design Started: July 2010 (Tentative)
  • Contract Award Date: May 2011 (Tentative)
  • Construction Start: May 2011 (Tentative)

Note: Dates are subject to change due to weather and/or other unforeseeable events.

 

Public Works •150 E Main Street • Hillsboro OR 97123 • (503) 681-6147 • Email

All Departments Administration Building Economic Development Engineering Fire Municipal Court Parks Planning Police Public Works Utility Billing Water more...
Administration Building Fire Library Municipal Court Planning Police Utility Billing